Procedures and Standards for Computerized Maintenance Management System “CMMS”

  • Prepared Procedures and Standards for setting up Computerized Maintenance Management System “CMMS” for Syrena Hotels: Hotel Polonia Palace, Hotel Metropol and Hotel MDM.
  • Total Construction area: 50 000m2.
  • Total number of keys: 550

 

Hotel MDM

 

Hotel Metropol

 

Hotel Polonia Palace