Data Center Commissioning Plan with Commissioning Checklists

Prepared Data Center Commissioning Plan with Commissioning Reports

The Commissioning Plan and Cx Checklist includes the following:

  • Final Commissioning Plan with Integrated Systems Testing (IST)
  • Commissioning and IST Timeline Schedule
  • Commissioning Levels: 1 – 5
    • Cx Level-1: Factory Witness Tests (FWT)
    • Cx Level-2: Field Component Verification (FCV) and Inspection
    • Cx Level-3: Pre-Functional Testing (PFT) & Startup
    • Cx Level-4: Site Accepting Tests, Functional Performance Tests (FPT)
    • Cx Level-5: Integrated Systems Testing (IST)
  • Commissioning Checklists for:
    • Mechanical Equipment and Installation
    • Chillers, CRACs, Chilled Water Retention Tanks
    • Chilled Water Installation
    • HVAC Equipment and Installation
    • HVAC Controls
    • Building Management System (BMS)
    • Fire Protection Installation
    • Outdoor Sprinkler Tank, 295 m3
    • Air Compressor and Pneumatic Installation
    • Smoke Control Systems
    • Fire Extinguishing Equipment and Installation
    • Plumbing Installation
    • Electrical Equipment and Installation
    • Uninterrupted Power Supply (UPS) with Batteries
    • Power Control System (PCS)
    • Low Current and Systems (LCS)
    • Fire Alarm and Voice Alarm Systems
    • Generators and Fuel Tanks
    • IT Hall, built by Lampertz System
    • Architectural Civil and Structural Works
    • Raised Floors
    • Integrated Systems Testing (IST)
    • Load Bank