Prepared Data Center Commissioning Plan with Commissioning Reports
The Commissioning Plan and Cx Checklist includes the following:
- Final Commissioning Plan with Integrated Systems Testing (IST)
- Commissioning and IST Timeline Schedule
- Commissioning Levels: 1 – 5
- Cx Level-1: Factory Witness Tests (FWT)
- Cx Level-2: Field Component Verification (FCV) and Inspection
- Cx Level-3: Pre-Functional Testing (PFT) & Startup
- Cx Level-4: Site Accepting Tests, Functional Performance Tests (FPT)
- Cx Level-5: Integrated Systems Testing (IST)
- Commissioning Checklists for:
- Mechanical Equipment and Installation
- Chillers, CRACs, Chilled Water Retention Tanks
- Chilled Water Installation
- HVAC Equipment and Installation
- HVAC Controls
- Building Management System (BMS)
- Fire Protection Installation
- Outdoor Sprinkler Tank, 295 m3
- Air Compressor and Pneumatic Installation
- Smoke Control Systems
- Fire Extinguishing Equipment and Installation
- Plumbing Installation
- Electrical Equipment and Installation
- Uninterrupted Power Supply (UPS) with Batteries
- Power Control System (PCS)
- Low Current and Systems (LCS)
- Fire Alarm and Voice Alarm Systems
- Generators and Fuel Tanks
- IT Hall, built by Lampertz System
- Architectural Civil and Structural Works
- Raised Floors
- Integrated Systems Testing (IST)
- Load Bank