Commissioning Report for Chilled Water Equipment and Systems with sea water loop

Hyatt Regency

5 Star

284 keys

Construction Area: 55 375m2

18 floors above ground level, 3 floors under ground

Ataköy, Istanbul

1/2011 – 2/2015

 

Commissioning Report for Chilled Water Installation and Building Management Systems.

The Water Cooled Chillers use sea water for cooling off 3 (three) chillers with total cooling capacity of 4500 kW.

MEP and Test & Commissioning Consulting Services were performed, in cooperation of Hyatt International Technical Services “H.I.T.S.”,  APEAS, Melden, MET and Destek Companies.

The hotel with adjacent residential building has a total construction area of 65 000 m2, the Hotel has total construction area of 55 375m2. The hotel has 284 guestrooms, a presidential apartment, suits, 2 (two) restaurants, bars, indoor and outdoor swimming pools, saunas, Turkish baths, fitness center, a ballroom of 956 m2, 7 (seven) meeting rooms, underground car parking, technical and administration facilities.

MEP, BMS and LCS  Consulting and Testing & Commissioning Services were provided for the investor TAVROS Company and for the Hotel Operator “HYATT REGENCY”.

MEP Consulting Services have been provided since the beginning of conceptual design stage. CSE Engineering prepared Testing & Commissioning Plan with Commissioning Check Lists, Supervised Commissioning Works, Handover of works.

The Commissioning Plan was prepared in accordance with ASHRAE Commissioning Guidelines, Hyatt “DR&MS” and “ER&MS”.

CSE Engineering has prepared The Commissioning Checklist and Functional Performance Tests “FPT”, Snag List and Handover Checklists for MEP, HVAC, Fire & Life Safety equipment and systems. Managed commissioning activities in the field together with the Investor’s Technical Team, the Contractors, HYATT Technical and FM Team and AON Insurance Company.

Test and Commissioning and Engineering Consulting Services for:

  • Mechanical installation
  • Electrical installation
  • Plumbing installation
  • Fire Ventilation
  • HVAC Automatic Controls
  • Building Management System “BMS”
  • Room Management System “RMS”
  • Fire Protection Installation
  • Smoke Control Systems
  • Emergency Lighting System
  • Fire Alarm System “FAS”
  • Voice Alarm System “VAS”
  • Security Systems

 

 

 