Design-Build Mechanical, Plumbing, Fire Protection and Fire/Smoke Ventilation
- Mechanical Installation
- Heating Ventilation and Air-conditioning (HVAC) Installations
- Fire Protection Installation: Sprinkler and Fire Hydrant Installations
- Smoke Control Equipment and System
- Plumbing Installation
- Water Filtration System
Construction Management and Test & Commissioning (T&Cx.) Services for:
- Building Management System (BMS)
- HVAC Controls
- Fire Alarm System
- Voice Alarm System
- Emergency Lighting
- Electrical Installation
- Low Current Systems (LCS): CCTV, IAS, IT, ACS, Sat-TV
- Access Control for underground Car Parking
- Managed Handover of the Mechanical Electrical Plumbing (MEP) Equipment, Installation, BMS, Fire & Life Safety Installations, As Built Documents, O&M Manuals, Warranty Documents.
Project Management Services for Facility Management and Tenant Fit out Works:
- Set up Technical O&M Team and managed in-house and outsourcing contracts for Technical Operation and Maintenance “O&M” for Building, Mechanical, Electrical, Plumbing, BMS, Fire and Life Safety installations.
- Training of O&M Team.
- Managed various Tenant Fit Out Projects for:
- Canadian Embassy Interim Office,
- Dresdner Bank Polska S.A. Headquarter,
- Restaurants and Food Courts,
- Offices,
- Medical Clinic,
- Retails Shops.
28 floors above the ground level
3 underground levels
Completion Date: October 1999
Construction Area: 56 000 m2