Recommissioning of Existing Smoke Control System & Commissioning of New Design and Installations

Syrena Hotels; METROPOL HOTEL, Warsaw, Poland: Recommissioning of Existing Smoke Control System and Commissioning of New Design and Installation

 

  • Recommissioning of Existing Smoke Pressurization As Built Documents, Installations and Automatic Controls dated February 2004.
  • Technical Report with Recommendations for new Smoke Control System for Lifts Shaft Pressurization in accordance with NFPA 92A Standard for Smoke-Control Systems and BS EN-12101-6 Norm.
  • Prepared Concept Design, Budget Cost for Design and Construction Works.
  • Commissioning of Tender Design.
  • Prepared Tender Documents and Managed Tendering
  • Commissioning of Execution Design.
  • Commissioning of New Works.
  • Managed Handover of works to the Owner.

Construction area: 15 000 m2

Completion Date: October 2013